Roofed, painted and tiled.May 22, 2011
|
|

The finished product.May 22, 2011
|
|

Four firings increasing in temperature each time. Waiting for a tile front and stone veneer.May 22, 2011
|
|

The base will be covered with this stone veneer. Once again something that I've never done before.May 22, 2011
|
|

I built an insulated door for the front to keep out the insects and wildlife.May 22, 2011
|
|

The insulation is in, the roof is finished and the chimney is flashed.I've given it a base cote of paint to protect it from the elements.May 22, 2011
|
|

The built up door. Plywood and two pieces of spaced asbestos. And then a piece of spaced steel.May 22, 2011
|
|

We're into this about 4 or 5 firings now. Each one a little hotter than the last. I've still got work to do.May 22, 2011
|
|